Roofing Debris Removal in Lakeland Florida
Roofing Debris Removal in Lakeland FL
The short answer
A 20-yard dumpster holds a single-layer shingle roof up to about 2,500 square feet and costs $385. It includes 2 tons, and most full roofs weigh more than that, so plan on $65 for each ton over. Two-layer, metal, and flat roofs need a 30-yard for space. Tile roofs take several loads. Call (863) 412-5036 with your roof size, material, and layer count before you book.
Florida's climate wears asphalt shingles out in 15 to 20 years, and every roof replacement creates tons of material that has to come off before the new roof goes on. My Dumpster Service delivers roll-off dumpsters for roofing debris throughout Lakeland and Polk County, for homeowners and roofing contractors alike.
The material and the number of layers decide the dumpster size more than square footage alone. You can also reach us through our contact page.
Roofing Debris Weight by Material
The weight difference between roofing materials is huge. A square (100 square feet) of asphalt shingles weighs 200 to 350 pounds. A square of concrete tile weighs 900 to 1,200 pounds, four to six times more for the same roof area.
| Roofing material | Weight per square | 2,000 sq ft roof | What to plan for |
|---|---|---|---|
| Asphalt shingles (1 layer) | 200 to 350 lbs | 4,000 to 7,000 lbs | One 20-yard, usually with some overage |
| Asphalt shingles (2 layers) | 400 to 700 lbs | 8,000 to 14,000 lbs | A 30-yard plus overage, or two loads. Call before booking. |
| Metal roofing panels | 50 to 150 lbs | 1,000 to 3,000 lbs | Space fills before weight. A 30-yard works well. |
| Clay tile | 600 to 900 lbs | 12,000 to 18,000 lbs | About 3 to 5 loads at 2 tons each. Call before booking. |
| Concrete tile | 900 to 1,200 lbs | 18,000 to 24,000 lbs | About 5 to 6 loads at 2 tons each. Plan a swap schedule. |
| Flat membrane (TPO/EPDM) | 50 to 100 lbs | 1,000 to 2,000 lbs | Bulky sheets. A 30-yard handles most homes. |
Which Dumpster Size for Roofing?
| Size | Best for | Price and weight |
|---|---|---|
| 15-yard | A small roof section, shed, or patio cover. With only 1 ton included, it is too small for a full roof. | From $335, 1 ton |
| 20-yard | A single-layer shingle roof up to about 2,500 sq ft. Also the size to use for tile roofs, since weight is the limit. | From $385, 2 tons |
| 30-yard | Two-layer tear-offs, roofs over 2,500 sq ft, metal roofs, flat roofs, and commercial jobs that need more space. | From $485, 2 tons |
Each ton over the limit is $65. Extra days after 7 are $25 each. See the full dumpster size guide, or call us before booking tile or multi-layer jobs.
Roofing Material Breakdown
Asphalt Shingles
Asphalt shingles are the most common roof in Lakeland, and one of the heavier ones. A 2,000 square foot home produces 4,000 to 7,000 pounds from a single layer, or 2 to 3.5 tons. That is up to 1.5 tons over the 2 tons included, or about $100 in overage at $65 per ton. Shingle sizing and our roof calculator are on the shingle disposal page.
Tile Roofing (Clay and Concrete)
Tile is the heaviest roofing material. Concrete tile runs 900 to 1,200 pounds per square, so a 2,000 square foot tile roof produces 9 to 12 tons of debris. Planned at 2 tons per 20-yard load, that is about five to six loads for the tile alone. Clay tile is lighter at 600 to 900 pounds per square but needs the same planning.
Keep tile loads to no more than one-third of the dumpster height before calling for pickup. Load tile flat and compact rather than in large broken chunks that leave air gaps. Tile reroofs are multi-day, multi-load jobs, so set up the swap schedule before the crew starts. When a dumpster fills, work stops until it is swapped.
Metal Roofing
Metal roofing is light. Panels run 50 to 150 pounds per square, so a 2,000 square foot metal roof weighs only 1,000 to 3,000 pounds. Space is the limit, not weight. Long panels are awkward and leave big air gaps, and a 30-yard handles most homes in one load. Panels with screws and fasteners attached go in as-is.
Flat Roof Membrane (TPO, EPDM, Modified Bitumen)
Flat roof membranes are light but come off in large sheets. TPO and EPDM weigh 50 to 100 pounds per square. Most of the debris is membrane sheets, the insulation boards underneath, and wood nailers at the edges. This is a space job, and a 30-yard handles most homes. Commercial flat roofs need more than one dumpster.
Other Materials That Go in the Roofing Dumpster
Everything that comes off the roof during a tear-off goes in the same dumpster: underlayment, old decking and sheathing, valley flashing, drip edge, pipe boots, chimney flashing, and packaging from the new roofing materials. No sorting needed.
Rotted decking adds weight. OSB and plywood run 1 to 1.5 pounds per square foot, so replacing 500 square feet of decking adds 500 to 750 pounds. On a shingle job already past the 2-ton limit, that adds to your overage, so factor it in.
What Cannot Go in the Roofing Dumpster
Storm Damage Roof Repairs in Lakeland
Hurricane season runs June through November. High winds peel back shingles, hail cracks tile, and fallen trees punch through roof decks. After a storm, roofers across Polk County work long hours to get damaged roofs covered and replaced.
Dumpster availability gets tight fast after a major storm, since every roofing crew in the area needs one at the same time. Call us directly at (863) 412-5036 rather than booking online for a faster answer on same day availability.
No permit is needed for a dumpster on private property, like a driveway. If it has to sit on the street, the City of Lakeland may require a permit. Storm damage that reaches trusses, rafters, or wall framing mixes roofing debris with demolition debris. See the demolition debris removal page for those loads.
Why Florida Roofs Turn Over So Often
Florida is harder on roofs than most of the country. Strong sun breaks down asphalt shingles faster, daily heat makes materials expand and shrink, humidity gets into underlayment and decking, and hurricane season tests every nail and seam. Shingle roofs in Lakeland typically last 15 to 20 years, compared to 25 to 30 years in cooler climates. Roofers stay busy year-round, with peak demand in the cooler, drier months from October through April.
Roofing Contractors and Dumpster Scheduling
A roofing crew can tear off an average home in a single day, so the dumpster needs to be in place before the crew arrives. Debris piled on the ground is a safety issue and means handling everything twice.
For multi-day or multi-load jobs, set up the swap schedule before tear-off begins. Call us with the roof size, material, and start date, and we will set up a delivery and swap plan. Roofing contractors with several crews who want ongoing service can reach us at (863) 412-5036 or through the contact page.
Frequently Asked Questions
What size dumpster do I need for a roof tear-off in Lakeland?
A 20-yard holds a single-layer shingle roof up to about 2,500 square feet and costs $385. It includes 2 tons, and most full roofs weigh more than that, so plan on $65 for each ton over. Two-layer tear-offs, metal roofs, and flat roofs need a 30-yard for space. Tile roofs are heavy enough to need several loads. Call us with the roof size, material, and number of layers before booking.
How much do roofing shingles weigh?
Asphalt shingles run 200 to 350 pounds per square (100 square feet). A 2,000 square foot roof produces 4,000 to 7,000 pounds from a single layer, or 2 to 3.5 tons. Two layers double that. Most full single-layer roofs go over the 2 tons included with a 20-yard or 30-yard.
Can you deliver a dumpster for emergency storm roof repairs in Lakeland?
Yes. Call us directly at (863) 412-5036 for storm damage requests. After a major storm, dumpster availability gets tight across Polk County. Calling rather than booking online gets you a faster answer on same day availability. No permit is needed for a dumpster on private property, so nothing holds up delivery on that end.
How many dumpsters does a residential reroof need?
A single-layer shingle roof up to about 2,500 square feet fits in one 20-yard, usually with some overage at $65 per ton. A two-layer tear-off needs a 30-yard or two loads. Tile reroofs take several loads because of their weight. Call us with your roof size and layer count for a specific plan.
Can I put roofing shingles in with other construction debris?
Yes. Shingles mix with wood decking, underlayment, flashing, and other roofing parts in the same dumpster. Keeping shingles separate is better for recycling, but mixed roofing loads go to construction and demolition landfills without issue.
Ready to get a dumpster on site for your roofing project? Same day delivery is available in most of Polk County.
Call (863) 412-5036 Contact usService Area
We deliver dumpsters for roofing debris throughout Lakeland and Polk County, plus Plant City and Sydney:
Not sure if your address is in our area? Call (863) 412-5036 and we'll tell you right away. See the full service area.

