Multi-Story Demolition in Lakeland Florida

← Back to Demolition Services

Multi-Story Demolition in Lakeland, FL

The short answer

Multi-story demolition is specialized work, so we coordinate it through licensed demolition partners. They handle the engineering, equipment, and demolition. We handle the roll-off dumpsters, debris hauling, and scheduling, so you have one local point of contact from start to finish. Call (863) 412-5036 for a free consultation.

How We Handle Multi-Story Projects

Part of the jobWho handles it
First call, scope, and schedulingMy Dumpster Service
Structural review and demolition planOur licensed demolition partner and their engineer
Permits and required noticesOur licensed demolition partner
Heavy equipment and demolition workOur licensed demolition partner
Roll-off dumpsters, swaps, and debris haulingMy Dumpster Service

Already have a demolition contractor? We can supply just the dumpsters and hauling for their job.

Why Multi-Story Demolition Is Different

A single-story building can come down at ground level. A multi-story building cannot. It has to come down from the top, one floor at a time, so the floors below keep supporting the work above. That takes an engineered plan, specialized equipment, and a crew that does this kind of work every day.

Single-storyMulti-story
MethodTaken down at ground levelTop down, floor by floor
EngineeringSometimesA planned demolition sequence
EquipmentStandard excavatorsLong-reach and specialized equipment
DebrisA few dumpster loadsMany loads on a planned swap schedule

Industrial and High-Reach Demolition

The same partner model covers other heavy demolition work. Our licensed partners bring the specialized equipment, and we bring the dumpsters and hauling.

Industrial buildingsWarehouses, plants, and commercial structures with heavy steel, concrete, and equipment to remove.
High-reach demolitionTall structures taken down with long-reach excavators instead of from inside the building.

The Typical Sequence

  • Planning: structural review, demolition sequence, permits, and utility disconnects.
  • Asbestos inspection and notice: required before demolition for most commercial and larger apartment buildings.
  • Site prep: fencing, dust control, and equipment staging.
  • Roof and top floor: roofing and rooftop equipment come off first.
  • Floor by floor: each level comes down in order, with debris hauled out as the work moves.
  • Ground floor and cleanup: the last level, the slab if required, and final site cleanup.

Asbestos Rules for Larger Buildings

Plan for this early. Federal asbestos rules require a thorough asbestos inspection before demolishing commercial buildings and apartment buildings with more than four units. The state must also get written notice at least 10 working days before demolition begins. In Florida, that goes through the Department of Environmental Protection or its local program. Any asbestos found has to be handled before demolition.

Debris and Dumpsters for Big Demolition Jobs

Multi-story demolition creates far more debris than one dumpster can hold. We plan the hauling around the demolition pace so a full dumpster never stops the crew.

  • 30-yard dumpsters: our largest size, with a 4-ton limit per load.
  • Scheduled swaps: we pick up full dumpsters and drop empty ones on a set schedule.
  • Concrete planning: concrete hits the weight limit fast, so it gets its own load plan. Try our concrete weight calculator.
  • Contractor accounts: volume pricing and invoicing for demolition contractors.

Permits for Demolition

The Florida Building Code requires a permit to demolish a building. Inside Lakeland city limits, call Building Inspection at 863-834-6012. Outside city limits, call Polk County Building at (863) 534-6080. On partner-led projects, our demolition partner handles the permit and required notices.

Frequently Asked Questions

Do you demolish multi-story buildings yourselves?

No. Multi-story demolition is specialized work, so we coordinate it through licensed demolition partners. We handle the roll-off dumpsters and debris hauling, and we keep one point of contact for you. Call (863) 412-5036 to start with a free consultation.

Why are multi-story buildings taken down from the top?

Working from the top down keeps the building stable. Each floor below keeps supporting the work above it. Removing supports at the bottom while floors still sit on top is how uncontrolled collapses happen.

Does a multi-story building need an asbestos inspection before demolition?

In most cases, yes. Federal asbestos rules require a thorough inspection before demolishing commercial buildings and apartment buildings with more than four units, plus written notice to the state at least 10 working days before demolition starts. In Florida, that notice goes through the Department of Environmental Protection or its local program.

What permits does multi-story demolition need?

The Florida Building Code requires a permit to demolish a building. Inside Lakeland city limits, Building Inspection is at 863-834-6012. Outside city limits, Polk County Building is at (863) 534-6080. Larger buildings may also need engineered demolition plans and utility disconnects.

What size dumpsters do you supply for large demolition jobs?

Most large demolition jobs use our 30-yard dumpsters, which hold 4 tons each. Big jobs need many loads, so we plan scheduled swaps around the demolition pace. Contractors can set up an account with volume pricing and invoicing.

Planning a multi-story demolition? Start with one call. We will connect you with the right partner and plan the hauling.

Call (863) 412-5036 Request a consultation